No products
M00000727
New product
WRC Volume 41 No. 07-08 1986
Progress Reports Volume 41 No. 07-08 1986Report / Survey by Welding Research Council, 1986
Welding Research Council, Inc.
In stock
CONTENTS
- Executive Committee Attachments, May 21, 1986
- PVRC Steering Committee on Piping Systems, May 19, 1986
- Technical Committee on Piping Systems, May 19, 1986
- Task Group on Damping, May 19, 1986
- Materials Division, May 20, 1986
- Subcommittee on Pressure Vessel Steels, May 20, 1986
- Subcommittee NDE of Pressure Components, April 14, 1986
- Fabrication Division, May 21, 1986
- Subcommittee on Significance of Weld Discontinuities, May 20, 1986
- Subcommittee on Weld Metals and Welding Procedures, April 16, 1986
- Subcommittee on Thermal and Mechanical Effects, May 21, 1986
- Subcommittee on Cyclic and Creep Behavior of Components, May 19, 1986
- Design Division, May 21, 1986
- Subcommittee on Reinforced Openings and External Loads, May 19, 1986
- Subcommittee on Elevated Temperature Design, May 20, 1986
- Subcommittee on Piping Pumps and Valves, May 20, 1986
- Subcommittee on Shells and Ligaments, May 20, 1986
- Subcommittee on Bolted Flanged Connections, May 20, 1986
- Joint Task Group on Elevated Temperature Behavior of Bolted Flanges, May 19, 1986
- Task Group on Gasket Testing, January 28, 1986
- Subcommittee on Dynamic Analysis of Pressure Components, May 20, 1986
- Task Group on Dynamic Stress Criteria, January 28, 986
- Future Meeting Dates