No products
M00000636
New product
WRC Volume 50 No. 05-06 1995
Progress Reports Volume 50 No. 05-06 1995Report / Survey by Welding Research Council, 1995
Welding Research Council, Inc.
In stock
CONTENTS
This volume includes the full Minutes of the Executive Committee, Design Division and Materials and Fabrication Division. The balance of the PVRC Minutes, including those of the PVRC Cyclic Life and Environmental Effects, appear in the companion volume, July/August 1995 Progress Reports.
- Executive Committee, February 1, 1995
- JPVRC Progress Reports
- Task Group on Continuing Operation of Equipment, January 30, 1995
- Fatigue Coordinating Committee, January 31, 1995
- Design Division, February 1, 1995
- Committee on Bolted Flanged Connections, January 31, 1995
- Subcommittee on Flange Parameter Study, January 30, 1995
- Subcommittee on Gasket Testing and Elevated Temperature Flange Joint Behavior, January 30, 1995
- Committee on Dynamic Analysis and Testing, January 31, 1995
- Subcommittee on Dynamic Stress Criteria, Janaury 31, 1995
- Subcommittee on Dynamic Stress Criteria, October 10, 1994
- Committee on Elevated Temperature Design, January 31, 1995
- Committee on Piping and Nozzles, January 30, 1995
- Subcommittee on Shell Intersections, January 30, 1995
- Task Group on Large Diameter Shell Intersections, January 30, 1995
- Committee on Polymers for Pressure Components, January 31, 1995
- Committee on Shells and Ligaments, January 30, 1995
- Materials and Fabrication Division, February 1, 1995
- Committee on Failure Modes, January 31, 1995
- Committee on Nondestructive Examination, January 30, 1995
- Committee on Thermal and Mechanical Effects, January 31, 1995
- Committee on Welds, January 31, 1995
- PVRC Committee Structure
- PVRC Committee Personnel
- PVRC Alphabetical Listing