No products
New product
Presents procedures for performing close-interval DC pipe-to-electrolyte potential surveys on buried or submerged metallic pipelines. This standard addresses the potential survey component of hybrid survey techniques such as trailing-wire DCVG or intensive measurement surveys, but does not address other surveys such as cell-to-cell techniques used to evaluate the direction of current or the effectiveness of the coating. This standard is intended for use by corrosion control personnel involved with operating pipelines, contractors performing close-interval surveys, corrosion professionals interpreting close-interval survey data, and regulatory agencies.
Author | NACE |
---|---|
Editor | NACE |
Document type | Standard |
Format | File |
EAN ISBN | 1-57590-211-7 |
ICS | 23.040.01 : Pipeline components and pipelines in general 77.060 : Corrosion of metals |
Number of pages | 51 |
Year | 2007 |
Document history | |
Country | USA |
Keyword | 0207;SP0207 |