This powerpoint presentation begins by providing a brief overview of Spartanburg Water and its pro-active positionconcerning identification of aging infrastructure inneed of rehabilitation. A condition assessment of the Union Street pipeline is presented, along with Spartanburg Water responsibilities that included the following:provide insertion point(s)with 2" diameter opening;SCDOT Coordination;media notification;traffic control during theinspection process; and,velocity control. Benefits of the leak condition assessment are provided.
Product Details
Edition: Vol. - No. Published: 11/01/2008 Number of Pages: 19File Size: 1 file , 1.9 MB