More info
Full Description
This powerpoint presentation begins by providing a brief overview of the Lake Arrowhead Pipeline, includingraw water line history, station and class of pipe, and failures. A 1993 Aboveground Corrosion Study is presented, along with 1997 reasons for failure. A new approach to pipeline replacement is presented, including a condition assessment program, RFEC/TC Pipe Inspection, Failure Risk Assessment, final report, city response, and lessons learned. Includes tables, figures.Product Details
Edition: Vol. - No. Published: 11/01/2008 Number of Pages: 35File Size: 1 file , 2.8 MB