Could I help you?
New Sale! View larger

AWWA ACE68803

New product

AWWA ACE68803 A Fast-Track Year: Advanced Treatment/Reclamation Augments Water Supply During Drought in Brisbane, Australia

Conference Proceeding by American Water Works Association, 11/01/2008

Freeman, Scott; Neemann, Jeff J.; Steichen, Mark; Hemken, Brad

More details

$10.56

-56%

$24.00

More info

Full Description

This powerpoint presentation begins by presenting a brief overview of the severe water shortage in Brisbane, Australia. A multi-facetted list of solutions is provided, including reuse at power stations and indirect potable reuse. The world's largest membrane-basedwater reclamation projects are listed, along with the initial plan, six existing wastewater treatment plants, advanced water treatment plant locations, and a process diagram including the following steps: chloramine disinfection controls biofouling; coagulation/sedimentation lowers concentrations; microfiltration/ultrafiltration (MF/UF) microbial log removal; reverse osmosis removes dissolved material; ultraviolet Hsub2/subOsub2/sub - advanced oxidation; stabilization - corrosion control for pipelines; disinfection - chlorine residual for pipelines; biological denitrification - lowers TN to river; breakpoint chlorination - lowers NH3 to river. An example of a case study at the Bundamba Site is presented. Includes tables, figures.

Product Details

Edition: Vol. - No. Published: 11/01/2008 Number of Pages: 44File Size: 1 file , 2.8 MB