This powerpoint presentation begins by providing a brief overview of a case study at the Pecan GroveMunicipal Utility District (MUD) to meet groundwater reductionrequirements by building a 2 mgd, base load, surface water treatmentplant. Source water quality challenges are presented, along with the bench-scale test overview, thepilot test overview, and the full-scale plant layout. Presentation summary includes the following: integrated membranes were selected to meetthe District's water quality goals;successfully completed pilot testing; and, pilot test report is submitted to TCEQ forreview. Includes tables, figures.
Product Details
Edition: Vol. - No. Published: 11/01/2008 Number of Pages: 40File Size: 1 file , 5.4 MB