This powerpoint presentation begins by providing a brief overview of the Bossier City water treatment plant (WTP) and information on the project background including the following: expand treatment capacity from 25 mgd to45 mgd;evaluated conventional treatment, ultrafiltration/microfiltration (UF/MF)membrane treatment, and UF/MF and reverse osmosis (RO)treatment for capacity expansion; and,pilot study required to evaluate UF/MF andRO membrane treatment. The Status of the project is presented and includes the following:pilot study report was finalized in May 2008;selected settled water pretreatment for full-scaledesign; and,design will be finished in first quarter 2009. Includes tables, figures.
Product Details
Edition: Vol. - No. Published: 11/01/2008 Number of Pages: 23File Size: 1 file , 2.4 MB