Could I help you?
New Reduced price! AWWA WQTC55013 View larger

AWWA WQTC55013

M00001593

New product

AWWA WQTC55013 Large Scale Pilot Plant Construction and Operation

Conference Proceeding by American Water Works Association, 01/01/2001

Andersen, Steve;Budd, George;Hess, Alan;Burns, Nicolas

More details

In stock

$10.56

-56%

$24.00

More info

Full Description

The Passaic Valley Water Commission's Little Falls Water Treatment Plant is currently undergoing a major upgrade. The upgrade includes replacing the existing conventional treatment train with ballasted flocculation clarification (Actiflo), intermediate ozonation and biological filtration. As part of the design scope of this upgrade, Black to obtain state regulatory approval of the proposed processes and loading rates process which had not previously been approved in that state; and, gather useful operational guidelines for the full scale plant. The scope also required that a permanent pilot plant be provided in another location as part of the full scale plant construction, so most of the initial temporary pilot plant will become a part of this permanent facility. The plant had an existing custom fabricated 10-gpm plate settler, ozone and filtration pilot plant, which the client made available for our use. However to simulate the new process train, the smallest size unit available was a 140 gpm Actiflo clarification unit, which is much larger than usually used for pilot studies was required. Multiple stage intermediate ozonation and GAC bio-filters had to be provided; these required extensive modifications to the existing equipment. Finding a suitable location for the Actiflo unit with access to the raw water conduits and a drain that could take the large excess flow presented some initial difficulty. Black however, much of the work had to be self-performed or done through sub-contractors. Similarly, the plant laboratory was available to perform some of the analytical testing, but for a number of parameters an outside testing laboratory had to be used. The lessons learned, including the decisions, manpower effort, time schedule and costs involved in the design, construction, startup and operation of the pilot plant are presented and discussed, as well as recommendations for future efforts involving a pilot plant study of this size and magnitude. Includes figure.