AWWA DSS58693 Oregon's Largest Floating Cover Project

Conference Proceeding by American Water Works Association, 10/01/2003

Magura, Lawrence M.

More details

In stock

$10.56

-56%

$24.00

More info

Full Description

This slide presentation focuses on the Franzen Reservoir Rehabilitation Project by outlining information on: project history; project purpose; dam safety issues; design features; and schedule. The project objective was to rehabilitate Franzen Reservoir as a two-cell reservoir with a floating cover. Project background information includes: designed/built by City of Salem, 1950-51; 100 MG capacity, open single-cell reservoir; stores water treated at Geren Island WTF; and, provides critical storage capacity, particularly important during periods of high turbidity on the N. Santiam River during the winter season. The 1994 Salem Water System Master Plan: recommended replacement of 100 mg Franzen Reservoir; constructing two new 20 mg covered, pre-stressed concrete reservoirs at the Franzen site; a third 20 mg reservoir to be constructed at a site near Mountain View Reservoir in West Salem; and, questioning of seismic stability at Franzen Reservoir. The 1996 Safe Drinking Water Act Amendments (Long-Term Stage 2 Enhanced Surface Water Treatment Rule) requires uncovered treated drinking water reservoirs to be either phased-out or to have expensive on-site treatment upgrades done. Recommendations from the August 1999 Black

Product Details

Edition: Vol. - No. Published: 10/01/2003 Number of Pages: 46 File Size: 1 file , 2.7 MB