Could I help you?
New Reduced price! AWWA DSS60336 View larger

AWWA DSS60336

M00000743

New product

AWWA DSS60336 Bringing a River Water Treatment Plant into Compliance Cost Effectively

Conference Proceeding by American Water Works Association, 09/29/2004

Winegard, Michael H.

More details

In stock

$10.56

-56%

$24.00

More info

Full Description

This slide presentation outlines information on a project to bring the City of East Moline Water Treatment Plant into compliance with the Interim Enhanced Surface Water Treatment Rule and the Disinfectants/Disinfection Byproducts Rule (D/DBPR). Other concerns included: meeting the requirements of future regulations such as the Filter Backwash Rule and the Stage 2 Microbial and D/DBPR, ensuring proper chemical pretreatment, ensuring proper rapid mix and flocculation, and reducing finished water turbidity. Topics covered include: seasonal water quality issues; historical water quality summary; site plan; improvements to raw water pumps, rapid mix basins, flocculation and sedimentation basins; alternative treatment technologies; estimate of probable construction costs; and, results of the effort.