Could I help you?
New Reduced price! AWWA ACE61615 View larger

AWWA ACE61615

M00000541

New product

AWWA ACE61615 Commissioning Of New Residuals Handling Facilities At a Direct Filtration Plant in Phoenix, Arizona

Conference Proceeding by American Water Works Association, 06/17/2005

Gross, Mark; Thelin, Gordon; Urban, Mark; Johnston, Chad; Eickelberg, Kenny; Meyer, Carl

More details

In stock

$10.56

-56%

$24.00

More info

Full Description

This slide presentation outlines information on Phoenix, Arizona's Union Hills WTP 160 MGDImprovements Project. The project was done in three phases: Phase 1 involvedrebuilding the existing 32 filters andconstructing 4 new 5 MGD filters; Phase 2 involved a raw water impoundment split; Phase 3a involved pretreatment facilities and Phase 3b involved an interim dewatering building. Further topics covered include: designcriteria for residuals handling; high turbidity events; comparing operational parameters; residuals parameters during high turbidity events; raw and settled tubidities; average turbidity and production; total organic carbon removals; centrifuge dewatering parametersduring high turbidity events; residuals parameters during high turbidity events; and, residuals contingency plans.