Could I help you?
New Reduced price! AWWA DSS63721 View larger

AWWA DSS63721

M00000306

New product

AWWA DSS63721 IDSE Compliant Hydraulic Models Deliver More Than Stage 2 DBP Rule Compliance

Conference Proceeding by American Water Works Association, 09/01/2006

Davis, Stephen K.; Murphy, Brian M.

More details

In stock

$10.56

-56%

$24.00

More info

Full Description

Stage 2 of the Disinfection Byproduct Rule (DBPR) is designed to further reduceexposure to disinfection byproducts (DBP) in drinking water. The first step requiredunder the Stage 2 DBPR is completion of an Initial Distribution System Evaluation(IDSE). The purpose of the IDSE is to identify those locations within the distributionsystem where DBP concentrations are anticipated to be the highest. These representativelocations will then become the long-term compliance monitoring points.This paper discusses the sampling-based and hydraulic modeling-based methods bywhich the IDSE can be accomplished and highlight the additional benefits which can beexpected through the use of an IDSE compliant hydraulic model. Includes tables.